Solares Electrical's Prestige Clientele

East Kendall Fire Station #13: MDFR

Date: December 3, 2008 · Brief Description: New Construction · GC: Lemartec

Click to view the (East Kendall Fire Station #13: MDFR) image gallery.

New administrative facility for the Miami Dade Fire Rescue Department built under an aggressive schedule.
Category: Fire Stations
Schedule: Met
Scope: Site Work, Fire Alarm, Generator, Lightning Protection and UPS System.

Ludlam Road Bike Path Lighting

Date: March 2010 - December 2010 · Brief Description: Installation of 450 bollards · GC: Solares Electrical

Click to view the (Ludlam Road Bike Path Lighting) image gallery.

Installation of 450 bollards for bike path at Ludlam Rd.
Category: Roadways
Schedule: Met
Scope: Excavation, backfill, concrete bases, conduit, light fixtures

Miami MetroZoo Amazon and Beyond

Date: 2008-2009 · Brief Description: 5 new animal exhibition building · GC: PCL Construction

Click to view the (Miami MetroZoo Amazon and Beyond) image gallery.

Huge expansion at Metrozoo comprised of five buildings for animal exhibitions
Category: Parks
Schedule: Met
Scope: Electrical, Controls, Fire Alarm, Security, Lightning Protection, Utilities, Site Lighting

Opa-Locka Control Tower: MDAD

Date: February 27, 2010-2011 · Brief Description: Traffic Control Tower · GC: TGSV

Click to view the (Opa-Locka Control Tower: MDAD) image gallery.

Construction of new 200 feet tall traffic control tower and administration building. New tower replaced obsolete tower.
Category: Aviation
Schedule: Met
Scope: Electrical, Site Work, Fire Alarm, CCTV, Controls, Lighting Control and Lightning Protection.

Open Road Tolling (ORT): MDX / ETC

Date: November 13, 2010-2019 · Brief Description: Electronic Tolling · GC: ETC

Click to view the (Open Road Tolling (ORT): MDX / ETC) image gallery.

Installation of new tolling equipment at four (5) major MDX roads, SR-874, SR-878, SR-924, SR-836 & SR-112. The project also involves a 10 year maintenance on all components.
Category: Roadways
Schedule: Met
Scope: Fiber Optic Connection to all communication buildings and MDX backbone cable, Installation of CAT6 and power cables for cameras, RF cables for antennas as well as installation of all communication equipment. Solares also installed check-tags antennas.