Date: August, 1999 · Brief Description: New construction of unique cargo building · GC: Parson Aviation

Unique building architecture made our work very challenging due to the characteristics of the roof which had an oval shape embraced by a transparent fabric. Project had an extensive site work, warehouse area and office space.
Category: Aviation
Schedule: Met
Scope: Fire alarm, site lighting, generator and electrical work, lighting controls.
Date: April, 2002 · Brief Description: Medium Voltage · GC: Weathetrol

Very complex medium voltage installation which included a large switch gear a motor-controlled center. Solares was responsible for modifications to existing structures in order to allow the switch gear to be brought into the building.
Category: Hospitals
Schedule: Met
Scope: Chiller and cooling towers, all electrical work and lightning protection and controls.
Date: June 22, 2006 · Brief Description: Marina Remodeling · GC: Solares Electrical

Project consisting of updating 7 piers each exceeding 100 feet with new power pedestals. All work was performed on the water, and extremely challenging undertaking. All piers required new underground services Solares performed all the core drilling under the pier in order to run new feeders.
Category: Marinas
Schedule: Met
Scope: Power Modules, Power Pedestals & Utility Site Work.
Date: December 3, 2008 · Brief Description: New Construction · GC: Lemartec

New administrative facility for the Miami Dade Fire Rescue Department built under an aggressive schedule.
Category: Fire Stations
Schedule: Met
Scope: Site Work, Fire Alarm, Generator, Lightning Protection and UPS System.
Date: March 2, 2000 · Brief Description: Underground Pipe Laying · GC: Panamerican/Codina

Over 2,000 feet of both, communications duct-bank and FPL duct-bank, moreover, this corridor provided the necessary utilities for the Lan Chile cargo building. Our company also installed all project's manholes.
Category:
Schedule: Met
Scope: 2,000 feet of 9W5 and 2,000 feet of 12W4.