Date: November 13, 2010-2019 · Brief Description: Electronic Tolling · GC: ETC

Installation of new tolling equipment at four (5) major MDX roads, SR-874, SR-878, SR-924, SR-836 & SR-112. The project also involves a 10 year maintenance on all components.
Category: Roadways
Schedule: Met
Scope: Fiber Optic Connection to all communication buildings and MDX backbone cable, Installation of CAT6 and power cables for cameras, RF cables for antennas as well as installation of all communication equipment. Solares also installed check-tags antennas.
Date: 2006-2007 · Brief Description: Condominium · GC: TGSV

Multi story building with 80 condo units, pull area and indoor parking garage
Category: Aviation
Schedule: Met
Scope: Electrical, Fire Alarm, Generator
Date: October 28, 2005 · Brief Description: New Construction · GC: Aventura Engineering

New Fire Station for the Miami Dade Fire Rescue Department built under an aggressive schedule.
Category: Fire Stations
Schedule: Met
Scope: Site Work, Fire Alarm and Generator, complete electrical work and lighting.
Date: August, 1999 · Brief Description: New construction of unique cargo building · GC: Parson Aviation

Unique building architecture made our work very challenging due to the characteristics of the roof which had an oval shape embraced by a transparent fabric. Project had an extensive site work, warehouse area and office space.
Category: Aviation
Schedule: Met
Scope: Fire alarm, site lighting, generator and electrical work, lighting controls.
Date: January 2011- December 2011 · Brief Description: roof mounted solar panel · GC: Solares Electrical

Installation of solar panels at three Miami Dade County Parks
Category: Solar Projects
Schedule: on schedule
Scope: Complete design, purchasing and installation of solar panels and inverters on existing roofs