Date: February 27, 2010-2011 · Brief Description: Traffic Control Tower · GC: TGSV

Construction of new 200 feet tall traffic control tower and administration building. New tower replaced obsolete tower.
Category: Aviation
Schedule: Met
Scope: Electrical, Site Work, Fire Alarm, CCTV, Controls, Lighting Control and Lightning Protection.
Date: October 13, 2010 · Brief Description: Security Integration · GC: GTSI Corp.

Complete security integration of several highly sensitive areas.
Category: Ports
Schedule: Met
Scope: Communication, Fiber Optic, Intrusion.
Date: September 27, 2009 · Brief Description: Parking Garage Construction · GC: N and J

Precast multi story parking garage.
Category: Ports
Schedule: Met
Scope: Electrical Work, Site Lighting, Lightning Protection, Controls and 1 Generator.
Date: July 15, 2003 · Brief Description: Reconstruction of Plaza and new Plaza · GC: Archer Western

Reconstruction of existing mainland plaza, also temporary plaza both on 836 in addition to new ramp plaza at 17th avenue exit. As part of the project there were 2 underground utility tunnels that connected the administration building with the main plaza. Power and communication were carried through the tunnels via cable trades and conduit up to the pay booths.
Category: Roadways
Schedule: Met
Scope: Electrical Work, Lighting, Lightning Protection, Controls, Toll Equipment Rack System, Fiber Optics, Car Access System and 2 Generators.
Date: July 30, 2008 · Brief Description: Construction of New Toll Plazas · GC: MCM

Construction of new West and East mainland plazas. Each plaza consisted of administration building and several pay booths covered by a canopy. This project required an extensive amount of underground work which needed to be very precised.
Category: Roadways
Schedule: Met
Scope: Electrical Work, Lighting, Lightning Protection, Controls, Toll Equipment Rack System, Fiber Optics, Car Access System, Directional Bore and 2 Generators.